GIA Tower - Cambodia
Phnom Penh, Cambodia
Budget: 20000000 $
Gk engineering has been resquested to design the MEP for GIA tower
The scope of work covers:
- Electrical design
- Medium voltage distribution
- low voltage distribution
- Single line diagram
- Genset system
- Extra low voltage
- Data backbone design
- Access control
- Fire alarm system
- MVAC
- pressurization stair case design
- exhaust system
- VRV system
- Fresh air system
- Fuel system
- Plumbing
- domestic water
- sewage water
- sewage water treatment plant
- Fire fighting system
We have provide the full design in BIM, with full specification based on HONG KONG standards (BS+NFPA).