Norodom Hotel - Cambodge

Vérification sécurités / Vérifications techniques

Phnom Penh, Cambodge

L’association des parents d’élèves nous a mandatés pour réaliser un audit énergétique des batiments, afin de dimensionner les générateurs de secours, d’identifier des sources potentielles d’économies, ainsi que l’étude pour la production photovoltaïque et le temps de retour d’investissement.

 

B8 tower - Cambodge

CEP Design

Phnom Penh, Cambodge

Etude complete des lots techniques pour cette tour à usage mixte, « service apartment »et

FAO office - Reunion

CEP Design

Phnom Penh, Reunion

fnac albflakznflkazjflkncq;cn

SUN and Moon Hotel The light - Cambodia

CEP Design

Phnom Penh, Cambodia

gg

Lamborghini Showroom - Cambodia

CEP Design

Phnom Penh, Cambodia

GK engineering has worker with the interior designer Bloom architecture to provide a state of art hair salon, complying with Hong Kong Standards as required in Exchange Square Tower.

We provide the complete study for plumbing, electrical, air conditioning with air purifier, low voltage design.

THE NEXT DOOR HOUSE - Cambodia

CEP Design

Phnom Penh, Cambodia

GK engineering has worker with the interior designer Bloom architecture to provide a state of art hair salon, complying with Hong Kong Standards as required in Exchange Square Tower.

We provide the complete study for plumbing, electrical, air conditioning with air purifier, low voltage design.

AMBER RESORT - Cambodia

CEP Design

Kampot, Cambodia

GK engineering has worker with the interior designer Bloom architecture to provide a state of art hair salon, complying with Hong Kong Standards as required in Exchange Square Tower.

We provide the complete study for plumbing, electrical, air conditioning with air purifier, low voltage design.

VOLVO Show Room - Cambodia

CEP Design / Équipement

Phnom Penh, Cambodia

Bloom Architecture has requested us to review their MEP design in accordance with international standards. We provide the design review and software calculation for electrical installation, method of statement for electrical installation, brief specifications for plumbing, AC, and electrical to set up minimal requirements.

During construction we will visit the site to check that MEP installation is according to standards.

GIA Tower - Cambodia

CEP Design

Phnom Penh, Cambodia

Budget: 20 000 000,00 $

GK engineering has worker with the interior designer Bloom architecture to provide a state of art hair salon, complying with Hong Kong Standards as required in Exchange Square Tower.

We provide the complete study for plumbing, electrical, air conditioning with air purifier, low voltage design.

Diamond Twin Tower - Cambodia

CEP Design / Vérifications techniques

Phnom Penh, Cambodia

34 Storey Tower, mix use development project, office grade A and apartement, one wave pool, the fisrt in Cambodia.

We have supported the client along the construction for authorship for MEP.

We were involved for :

Plumbing approval of drawing and materials

Electricity approval of drawing and materials

HVAC approval of drawing and materials.

Our team was doing combined shop drawing to ensure that differents MEP contractors will not have any clashes during their installation.

 

 

Novotel Sihanoukville - Cambodia

CEP Design

Sihanoukville, Cambodia

Budget: 20 000 000,00 $

We did the full review of MEP regarding ACCOR requirements. We have also updated MEP design to latest Interior Design requirements.

Scope of work:

Chilled water system/ chiller and cooling towers

Hot water production

Fire detection/ fire protection

Electrical calculation

Sewage plant calculation

 

Cambopura Glass Factory - Cambodia

Vérifications techniques

Phnom Penh, Cambodia

Cambopura Glass Factory has contacted GK Engineering to support them because at first for a troubleshooting on their main breaker and to conduct on a second phase an audit on standard compliance with their electrical installation

We did record their power during half day with a power harmonic analyser to identify possible issues.

We proved that the Main breaker was sensitive to Harmonics and therefore tripped because of harmonics.

We have verified with computerised calculation the entire installation and have produced a full report on what was to be corrected, oversized, overspecified or unsafe.

 

Mekong House - Cambodia

CEP Design / Vérifications techniques

Phnom Penh, Cambodia

Budget: 350 000,00 $

Bloom Architecture has requested us to review their MEP design in accordance with international standards. We provide the design review and software calculation for electrical installation, method of statement for electrical installation, brief specifications for plumbing, AC, and electrical to set up minimal requirements.

During construction we will visit the site to check that MEP installation is according to standards.

Lucky Hair Salon - Cambodia

CEP Design / Équipement

Phnom Penh, Cambodia

Budget: 50 000,00 $

GK engineering has worker with the interior designer Bloom architecture to provide a state of art hair salon, complying with Hong Kong Standards as required in Exchange Square Tower.

We provide the complete study for plumbing, electrical, air conditioning with air purifier, low voltage design.